24.08.2012 (Friday). Luc Trevels informs me that the
frame of the new dredge will be ready on Monday morning. I was hoping to have
it on Friday, but I realize that constructing a frame for the dredge is not an
easy task and it has to be made carefully. Marie checks if we have everything
for DNA extraction. Almost everything is OK. We are just waiting for the
nucleospin extraction kit and the new pipettes we have ordered. I put the
white-gray-white code on all our boxes and items (the boxes of each team of
scientist has its own colour code). I make a photograph of all our boxes and
items.
25.08.2012 (Saturday). I buy the last small items
(mostly for me). At home I prepare my personal items (clothes, books,...),
which I want to include in the cargo.
26.08.2012 (Sunday). I go to the Institute to put my
personnal goods in the box 33. I realize that despite improved sewing two nets
for the dredges are not fastened strongly enough. I still improve the sewing.
27.08.2012 (Monday). Gilbert Claes (the head of
Logistic at our Institute) told me that it would be better to move the boxes on
Thursday afternoon than on Friday morning. I put a bit more silicone glue on
the sewed parts of the net of the Rauschert dredge. Henri Robert is back and willing
to help me with the radio beacon and the flash. It seems less complicated than
I feared. Charlotte Havermans brings me the missing identification sheets on
lysianassoid amphipods. I scan some scientific papers, which we did not have in
pdf-format and which could be useful during the cruise (pdfs weight nothing).
Around 14:00 I receive the frame of the new Rauschert dredge made by Luc
trevels. Good job but 4 small rings are missing. Luc used the older dredge as
model and did not see the small rings, which were completely hidden by the net
itself. Luc promises me to fix them for Tuesday morning. I realize I have not
sent the documents for the dangerous goods. Urgent! One of the form is
complicated. I need the help of Henri. He will be there tomorrow. I told Marie
that it is urgent to bring her clothes and personal effects to be put in the
boxes.
28.08.2012 (Tuesday). The metal frame of the new
dredge is now OK. After discussion with Henri Robert I complete the declaration
of dangerous goods and the IMO document for dangerous goods. I send to the AWI
logistic department a pdf and a printed copy. Yassine Loufa (technician of the
Department Invertebrates) proudly brings me a parcel with the new flash. So, it
arrived in due time!!!
29.08.2012 (Wednesday). I have e-mail discussions with
Christoph Held concerning the dangerous goods (absolute ethanol) and the frozen
fish to bring on board (which will be used as bait for the traps). I fix the
plates of vinyl and the net on the metal frame of the dredge constructed by Luc
Trevels. Not an easy job, especially for fixing the bolts and the nuts. It took
me nearly a whole day. As concerns the net, I first fixed it inadequately and I
had remove it and to do everything a second time. Claude De Broyer told me that
he could have some spare field clothes for Marie. Marie brought some personal
clothes. I realize I will have to go once more to the store for last minute
furniture. This will be for tomorrow and tomorrow is another day...
30.08.2012 (Thursday). Some useful clothes (belonging
to RBINS) are provided to us by Claude De Broyer. They are put in the boxes
along with the personal clothes of Marie. I scan some useful documents. Boxes
and trunks for the first travel are removed form the cellar and from the
corridor of the 7th floor. They will be put tomorrow in the van of RBINS.
Closed metal trunk
Closed carton boxes with the
buoys for the lander
No comments:
Post a Comment